DEVOLTEXContract garment manufacturing

04Process

How we work

From first enquiry to shipment of the run — five stages.

  1. Enquiry and specification

    You send a model, patterns or a sample garment and state the run size and timeline. We assess whether it suits our equipment.

  2. Materials and costing

    We confirm fabric, trims and consumption per unit. We work with your material or source our own, and can help with selection if needed.

  3. Trial sample

    We sew a sample for you to inspect and approve. Every correction is made before the run starts, not after.

  4. Approval and launch

    Once the sample is approved we lock the construction, size range and schedule. The run goes ahead against the approved reference.

  5. Production and shipment

    The run is produced with inspection at each stage. Shipment follows the agreed schedule, in batches or as a complete run.

What we need from you

The more precise your input, the faster we come back with real lead times rather than rough ones.

  • Sample or patterns

    A finished product or technical documentation. Without it the work cannot be costed.

  • Run size

    Approximate number of units. Both the schedule and the unit price depend on it.

  • Material

    Whether you supply the fabric and trims yourself, or need our help sourcing them.

  • Deadline

    The date you need the run by. We will tell you honestly whether we can meet it.

Frequently asked questions

What is your minimum order quantity?

From 500 units. We rarely take smaller runs — retooling the line for a short series makes it uneconomical for both sides.

Do you work with our fabric?

Yes, that is our primary model. You supply the material and trims, we are accountable for construction to your patterns. This way you retain full control over material quality and cost. If you prefer, we can source the materials ourselves.

Can you produce from our sample?

Yes. Send a sample garment or your patterns — we will sew a trial unit for you to inspect, and the run starts only after you approve it.

Do you work with foreign customers?

Yes. Until 2022 we produced for European partners. We understand European requirements for quality and supporting documentation.

What are your lead times?

7 to 30 days depending on the product and run size. Samples are faster — you approve the sample before we start the run. We confirm the exact schedule after reviewing your tech pack, and we hold to it.

Ready to start?

Describe the product and the run size — we will reply with an assessment of lead times. We charge nothing for a quote.